Hot Sale Galvanized T Head/Square Head Bolt and Nut

Model NO.: M2 to M24
Application: Machinery
Finish: Polishing
Safety: 3 Times Tensile Strength Test
Package: White Tissue Within Wooden Crate
Original: Qingdao
Trade Mark: at OEM ODM
Certification: ISO CE SGS
Shipping Port: Qingdao
Production Capability: 300, 000 PCS / Month
Trademark: AT
Transport Package: White Tissue Within Wooden Crate
Specification: M6 to M16
Origin: Qing′dao
HS Code: 73269090
Model NO.: M2 to M24
Application: Machinery
Finish: Polishing
Safety: 3 Times Tensile Strength Test
Package: White Tissue Within Wooden Crate
Original: Qingdao
Trade Mark: at OEM ODM
Certification: ISO CE SGS
Shipping Port: Qingdao
Production Capability: 300, 000 PCS / Month
Trademark: AT
Transport Package: White Tissue Within Wooden Crate
Specification: M6 to M16
Origin: Qing′dao
HS Code: 73269090


AT PRECAST manufacturer for construction precast including lifting system, rigging hardware, metal parts with 13 years experience.

Hot Sale Galvanized T Head/Square Head Bolt and Nut

Quick Details

Place of Origin:

Shandong China (Mainland)

Brand Name:

A&Tprecast

Packaging & Delivery

Packaging Detail:
box,carton,pallet
Delivery Detail: 30days or advance

Specifications
DIN 480 Square Head Bolts 
Material:Steel or stainless steel
 

1,Products Detailes
Products bolt,screw,nut,washer,pin,rivet and non-standard fastener
Size Standard and Non-standard according to drawing or samples
Machines auto pressing machines, automatic heading machine, cold header high-precision surface grinder machine, involantary grinder machines,Digital Micro Vickers Hardness tester, Electrolytic metrical thickness gauge, Vision Measuring Machine,Fischer Scope X-ray Thickness Gauge and so on
Material 1.Stainless Steel: SS201, SS303, SS304, SS316, SS410, SS420
2,Steel:C45(K1045), C46(K1046),C20
3.Brass:C36000 ( C26800), C37700 ( HPb59), C38500( HPb58),
C27200CuZn37), C28000(CuZn40)
4.Bronze: C51000, C52100, C54400, etc
5.Iron: 1213, 12L14,1215
6.Aluminum: Al6061, Al6063 etc
7,.Carbon steel: C1006,C1010,C1018,C1022,C1035K,C1045
8, Alloy steel: SCM435,10B21
Surface Finishing Zn- Plated,Ni-plated,Passivated,Tin-plated,Sandblast and Anodize,Chromate, Polish,Electro Painting,Black Anodize,Plain,Chrome plated,Hot Deep Galvanize(H. D. G. ) etc.
Heat Treatment Tempering,Hardening,Spheroidizing,Stress Relieving.
Standard ISO,GB,DIN,JIS,ANSI,BSW
Manufacture Process Heading/washer assembly/Threading/Secondary machine/heat treatment/plating/Anti-slipping/Baking/QA/Package/Shipping
Sample we can supply the samples for free,if the samples we have in stock
Lead time 10-15 working days as usual,It will based on the detailed order quantity.
Carton size 36*24*16 CM &36*24*12 CM
Pallet size 110*100*90 CM
Warranty we confirm our goods will satisfy your request of 100%,
After sales service we will follow up goods for every customer and help solve problem after sales.


Costomize available  when get drawing.

Hot Sale Galvanized T Head/Square Head Bolt and Nut

Hot Sale Galvanized T Head/Square Head Bolt and Nut
Hot Sale Galvanized T Head/Square Head Bolt and Nut
Hot Sale Galvanized T Head/Square Head Bolt and Nut



ABOUT US:


As your one-stop source, AT PRECAST,we design, manufacturer and distribute precast concret

eaccessories including the Lifting Systems and Anchoring systems Coil and Ferrule Inserts. for Concrete

and Prefabricated area.

As a leader in developing concrete accessory products, our main goal is to produce products that are

safer, faster and more cost efficient.

With more than totally 50 years working experience, our entire staff is dedicated to provide you with the

best customer service and competitive prices. Our sales force are able to answer your questions quickly

and offer you technical support .

Assurance,

 

100% quality manufacturing.

 We guarantee that our products meet your supplied specifications

 Extremely competitive pricing
 
Delivery to your port or front door

 4 ---- 8 week lead times

 We handle all paperwork

 Partial container orders

 Flexible payment options

 Unique tooling options

 Full range of packaging options from bulk to retail ready
 
Complete testing services available

FAQs


1. Where is your location?

We are located in Qingdao City of China and are closed to Airport. It takes 30minuts by car from Liuting

Airport our company.

2. How long has the company been established?

AT INDUSTRY was established in 2009. There is 6 years exporting experiences.

3. How many employees do you have?

Administration / sales    4

Engineering / design as our partner     8

Production as our partners 120

Quality assurance / inspection   10

4. Which countries do you export to?

U.S.A, Germany, France, Italy, UK, Brazil, Middle east of Asia, Thailand,

5. What proportion of your goods are exported?

100% of our production are exported to all over the world.

6. How long does it take to receive samples?

a) Pattern:30-45days after order 

b) Sample:30days after pattern finishing.

c) The lead time is the general production period and does not include the transportation time.

7. New product development process

Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept. to ensure

the developing schedule---Design pattern, fixture and gauge and making them in our house---mold steel

buying---Machining---Inspection---Send out the sample with initial inspection report.

8. How long is the manufacturing lead time?

Mass Production: 90days after sample approval by yours.

The lead time is the general production period including the transportation time.

We could make some special production arrangement effectively if customer has urgent need.

9. What basis can we buy goods?

We generally offer customers prices FOB& CIF (Carriage, Insurance & Freight). The CIF includes the

freight cost to your nominated sea port.

We do provide clearance of goods which needs to be handled by a local freight forwarder.

All local costs and taxes are the responsibility of the buyer. We are happy to offer advisement on shipping

if required.

10. What are the payment terms?

Payment terms are negotiable and will improve for long term customers.

During the initial stages, we request 50% of tooling fee in advance with the balance payable on

acceptance of samples.

Production orders can be negotiable. We prefer 50% deposit and the balance by T/T before sails. But

sometimes T/T 30 days after sails would also acceptable.

11. Which currency can we buy in?

We can deal in USD / Euro currency / GBP.

12. How long does it take to ship goods from China by sea?

It takes about 5 weeks to European ports plus 1 week customs clearance, so you can get the container

within 6 to 7 weeks. It takes about 2 weeks to east coast and 3 weeks to west coast US ports. All sea

goods are shipped from Qingdao Port.

13. How long does it take to ship goods from China by air?

It takes about 7 days to all major destinations.

14. Can we visit the factory to conduct an audit?

Yes, you are welcome to visit our partner factory by prior agreement.

15. How do we retain client confidentiality?

We are happy to sign Confidentiality Agreements with customers and will honor them.

16. Which languages do we do business in?

Although we do business with many countries around the world, we can only communicate effectively in

Chinese English.

All information supplied should therefore be supplied in this form.

17. Is there a minimum volume of business required to conduct international purchasing?

There are no minimum volumes, but the prices of the goods, plus the fixed costs of importing makes it

more economical to buy in high volumes. All potential customers will be assessed on an individual basis

to determine if it appears a viable option for all parties to develop a relationship.

18. What type of parts you are specialized in?

Our business contains two areas,

one is for construction precast including lifting system, rigging hardware metal parts.
 
Another is customized metal business of quality sand castings,

investment castings, lost foam castings, hot forgings, cold forgings, stampings,

machined parts, injectionmolded plastics parts, etc.

19. Which kind of equipments do you have?

Forging friction press 160Ton, 300Ton, 630Ton, 1200Ton

Casting furnace of 200kg, 500kg,1000kgs, 2000kgs

Press of 63ton, 120tons

CNC Machining center

CNC Vertical Lathe

CNC Lathe center

Boring machine

Drilling machine
Hot Sale Galvanized T Head/Square Head Bolt and Nut
 

AT PRECAST manufacturer for construction precast including lifting system, rigging hardware, metal parts with 13 years experience.

Hot Sale Galvanized T Head/Square Head Bolt and Nut

Quick Details

Place of Origin:

Shandong China (Mainland)

Brand Name:

A&Tprecast

Packaging & Delivery

Packaging Detail:
box,carton,pallet
Delivery Detail: 30days or advance

Specifications
DIN 480 Square Head Bolts 
Material:Steel or stainless steel
 

1,Products Detailes
Products bolt,screw,nut,washer,pin,rivet and non-standard fastener
Size Standard and Non-standard according to drawing or samples
Machines auto pressing machines, automatic heading machine, cold header high-precision surface grinder machine, involantary grinder machines,Digital Micro Vickers Hardness tester, Electrolytic metrical thickness gauge, Vision Measuring Machine,Fischer Scope X-ray Thickness Gauge and so on
Material 1.Stainless Steel: SS201, SS303, SS304, SS316, SS410, SS420
2,Steel:C45(K1045), C46(K1046),C20
3.Brass:C36000 ( C26800), C37700 ( HPb59), C38500( HPb58),
C27200CuZn37), C28000(CuZn40)
4.Bronze: C51000, C52100, C54400, etc
5.Iron: 1213, 12L14,1215
6.Aluminum: Al6061, Al6063 etc
7,.Carbon steel: C1006,C1010,C1018,C1022,C1035K,C1045
8, Alloy steel: SCM435,10B21
Surface Finishing Zn- Plated,Ni-plated,Passivated,Tin-plated,Sandblast and Anodize,Chromate, Polish,Electro Painting,Black Anodize,Plain,Chrome plated,Hot Deep Galvanize(H. D. G. ) etc.
Heat Treatment Tempering,Hardening,Spheroidizing,Stress Relieving.
Standard ISO,GB,DIN,JIS,ANSI,BSW
Manufacture Process Heading/washer assembly/Threading/Secondary machine/heat treatment/plating/Anti-slipping/Baking/QA/Package/Shipping
Sample we can supply the samples for free,if the samples we have in stock
Lead time 10-15 working days as usual,It will based on the detailed order quantity.
Carton size 36*24*16 CM &36*24*12 CM
Pallet size 110*100*90 CM
Warranty we confirm our goods will satisfy your request of 100%,
After sales service we will follow up goods for every customer and help solve problem after sales.


Costomize available  when get drawing.

Hot Sale Galvanized T Head/Square Head Bolt and Nut

Hot Sale Galvanized T Head/Square Head Bolt and Nut
Hot Sale Galvanized T Head/Square Head Bolt and Nut
Hot Sale Galvanized T Head/Square Head Bolt and Nut



ABOUT US:


As your one-stop source, AT PRECAST,we design, manufacturer and distribute precast concret

eaccessories including the Lifting Systems and Anchoring systems Coil and Ferrule Inserts. for Concrete

and Prefabricated area.

As a leader in developing concrete accessory products, our main goal is to produce products that are

safer, faster and more cost efficient.

With more than totally 50 years working experience, our entire staff is dedicated to provide you with the

best customer service and competitive prices. Our sales force are able to answer your questions quickly

and offer you technical support .

Assurance,

 

100% quality manufacturing.

 We guarantee that our products meet your supplied specifications

 Extremely competitive pricing
 
Delivery to your port or front door

 4 ---- 8 week lead times

 We handle all paperwork

 Partial container orders

 Flexible payment options

 Unique tooling options

 Full range of packaging options from bulk to retail ready
 
Complete testing services available

FAQs


1. Where is your location?

We are located in Qingdao City of China and are closed to Airport. It takes 30minuts by car from Liuting

Airport our company.

2. How long has the company been established?

AT INDUSTRY was established in 2009. There is 6 years exporting experiences.

3. How many employees do you have?

Administration / sales    4

Engineering / design as our partner     8

Production as our partners 120

Quality assurance / inspection   10

4. Which countries do you export to?

U.S.A, Germany, France, Italy, UK, Brazil, Middle east of Asia, Thailand,

5. What proportion of your goods are exported?

100% of our production are exported to all over the world.

6. How long does it take to receive samples?

a) Pattern:30-45days after order 

b) Sample:30days after pattern finishing.

c) The lead time is the general production period and does not include the transportation time.

7. New product development process

Got tooling order and sample order with 50% deposit---Hold a meeting with the relation dept. to ensure

the developing schedule---Design pattern, fixture and gauge and making them in our house---mold steel

buying---Machining---Inspection---Send out the sample with initial inspection report.

8. How long is the manufacturing lead time?

Mass Production: 90days after sample approval by yours.

The lead time is the general production period including the transportation time.

We could make some special production arrangement effectively if customer has urgent need.

9. What basis can we buy goods?

We generally offer customers prices FOB& CIF (Carriage, Insurance & Freight). The CIF includes the

freight cost to your nominated sea port.

We do provide clearance of goods which needs to be handled by a local freight forwarder.

All local costs and taxes are the responsibility of the buyer. We are happy to offer advisement on shipping

if required.

10. What are the payment terms?

Payment terms are negotiable and will improve for long term customers.

During the initial stages, we request 50% of tooling fee in advance with the balance payable on

acceptance of samples.

Production orders can be negotiable. We prefer 50% deposit and the balance by T/T before sails. But

sometimes T/T 30 days after sails would also acceptable.

11. Which currency can we buy in?

We can deal in USD / Euro currency / GBP.

12. How long does it take to ship goods from China by sea?

It takes about 5 weeks to European ports plus 1 week customs clearance, so you can get the container

within 6 to 7 weeks. It takes about 2 weeks to east coast and 3 weeks to west coast US ports. All sea

goods are shipped from Qingdao Port.

13. How long does it take to ship goods from China by air?

It takes about 7 days to all major destinations.

14. Can we visit the factory to conduct an audit?

Yes, you are welcome to visit our partner factory by prior agreement.

15. How do we retain client confidentiality?

We are happy to sign Confidentiality Agreements with customers and will honor them.

16. Which languages do we do business in?

Although we do business with many countries around the world, we can only communicate effectively in

Chinese English.

All information supplied should therefore be supplied in this form.

17. Is there a minimum volume of business required to conduct international purchasing?

There are no minimum volumes, but the prices of the goods, plus the fixed costs of importing makes it

more economical to buy in high volumes. All potential customers will be assessed on an individual basis

to determine if it appears a viable option for all parties to develop a relationship.

18. What type of parts you are specialized in?

Our business contains two areas,

one is for construction precast including lifting system, rigging hardware metal parts.
 
Another is customized metal business of quality sand castings,

investment castings, lost foam castings, hot forgings, cold forgings, stampings,

machined parts, injectionmolded plastics parts, etc.

19. Which kind of equipments do you have?

Forging friction press 160Ton, 300Ton, 630Ton, 1200Ton

Casting furnace of 200kg, 500kg,1000kgs, 2000kgs

Press of 63ton, 120tons

CNC Machining center

CNC Vertical Lathe

CNC Lathe center

Boring machine

Drilling machine
Hot Sale Galvanized T Head/Square Head Bolt and Nut
 

Heat sinks maximize the surface of an object to be cooled for heat dissipation to the air. It sounds simple, but there are still many factors to consider! Housing, air speed and the materials used play an important role in the efficiency of the chosen cooling method. The thermal resistance of the material, the design of the cooling fins, the post-treatment, and even the color of the Heat Sink are factors which are decisive for the efficiency of the cooling, as well as the attachment of the heat sink.

Cooler Heatsink

Cooler Heatsink,Long Life Cooler Heatsink,Laptop Heatsink Upgrade,Heat Sink With Fan

Timeplex Industrial Limited , https://www.timeplexhk.com