Grouting pump failure solution

Grouting pump failure solution

During the use of the grouting pump, certain conditions will surely occur. If some faults can be found in time and corrected in time, it will have a very positive effect both on the life cycle protection of the injection pump and the protection of the use effect. What are the solutions to the problem of pump injection when the pump is in a condition?

Fault 1: The pressure pump is damaged

Cause: The voltage is too high and the pressure is too high.

Fault solution: Replace the pressure pump.

Failure 2: high pressure injection pump can not increase

Cause: The bucket was blocked.

Fault solution: Remove the residue from the barrel, remove the obstructions in the barrel, and loosen the joint at the end of the pump to remove the pump interior and the ball spring.

Fault 3: Loose connection between the drill holder and the fuselage

Reason: The high pressure injection pump will cause the drill to loosen due to body vibration during the operation.

Fault solution: Take out the drill, use the electric drill to remove the internal gear, and lock it.

The failure of the pressure pump, the looseness of the drill holder and the joint of the fuselage, and the inability of the high-pressure injection pump to increase are common failures during the use of the injection pump. With the development of the injection pump, these failures have been well received. Solution. The use of each device must meet some difficulties, but as long as it is corrected in time, it is believed that this will minimize work injuries.

Stainless Steel Colander

Stainless Steel colander


Our excellent quality colander is durable and will carry the weight of vegetables, fruits, cooked rice or pasta. We also have the color powder coating items for you to choose.

We are confident that you will love our product ,which one suitable for you,welcome to ask for the sample to check the quality.


Description of Stainless Steel colander


Size:Dia 16/18/20/22/24cm

Material: Body :SS201/SS304/Iron

Finishing: Satin polishing ,Mirror Polishing ,Color painting ,powder coating

Logo: Laser logo, Etching logo, Silk printing logo, Embossed logo, Decal logo

MOQ : 2000 PCS

Packaging : White box, Mail box or Customized package

Sample Time : 7~10 days

Lead Time :60 days after have the deposit

Payment: T/T ,L/C or others

Payment term: 30% deposit before production and 70 % balance against the copy B/L

colandercolandercolander

FAQ:


1:How can I get the sample?

We can provide the sample for customers to check the quality.

Please kindly provide the delivery info for calculate the sample cost. If you have DHL /TNT/UPS/FEDEX account, please also kindly provide it to us.

You can do the payment of sample via T/T and PayPal.


2:How about the sample time?

Usually the sample time is 7~10 days after have the sample cost.


3:How long will it take for mass production?

Usually 45~60 days after have the deposit.


4:Can we have our logo or company name to be printed on your products or the package?

Welcome OEM.


5:what certificate can you provide?

CE,CB,GS,FDA,LFGB,ROHS are available here.


6:How can we get your monthly new products announcement?

Please join our mailing lists.


Metal Colander,Steel Colander,Stainless Colander,Stainless Steel Colander With Base

Jiangmen Wellway Houseware Co.,Ltd , https://www.hkwellway.com