The eight scientific and technological achievements are: “Research on the technology of single pile foundation and integrated auxiliary components in the transition section of offshore wind farmâ€, “Submerged pile technology of super large single pile fan in offshore wind farm†and “Anti-scouring design of foundation sand of offshore wind turbine†"Overall paving technology", "Design and research of offshore wind power offshore booster substation", "Research on key technologies of long-distance three-core 110kV submarine cable laying facilities", "Key technology research of offshore bulk transport wind power equipment", "Offshore wind turbines Development and application of single blade spreader", "Basic design load simulation of offshore wind turbines".
The machine consists of hopper, vibration chamber and coupling and motor. There are eccentric wheel, rubber shaft parts, main shaft bearing and so on. The adjustable eccentric weight can drive to the central line of main shaft through motor. Under the unstable state, it produces centrifugal force that makes raw material from vortex in the sieve. The size of eccentric weight can be regulated in accordance with the different raw materials. The Sieve Machine is suitable for flow
operation , it is an ideal equipment for granule which the size proportion is not uniform to separate.
It has centrifugal vibration separated layer sieve which is very practical.
Sieve Machine Sieve Machine,Sieve Shaker,Sieve Shaker Machine,Industrial Sieve Changzhou Jiafa Granulating Drying Equipment Co.,Ltd , http://www.jf-drying.com
Recently, China Guangdong Nuclear Power Jiangsu Rudong Offshore Wind Farm 150MW Demonstration Project (hereinafter referred to as “Rudong Projectâ€) won 8 scientific and technological achievements jointly approved by China Machinery Industry Federation and China High-tech Industrialization Research Association. The appraisal committee believes that the eight scientific and technological achievements jointly completed by Zhongguang Nuclear Wind Power Co., Ltd. and other participating units all have independent intellectual property rights. The project as a whole has reached the domestic leading level, with significant economic and social benefits and broad application prospects. The appraisal committee unanimously agreed to pass the scientific and technological achievements appraisal and issue certificates, and recommended to further expand the promotion of the technical achievements to meet market demand.
Rudong Project is located in the Yellow Sea area of ​​Rudong County, Nantong City, Jiangsu Province. It is the first offshore wind power project with the longest offshore distance and the largest installed capacity in China. The Rudong Project is about 25 kilometers from the coast, and the seabed elevation is at - Between 8 meters and -14.6 meters, it is also the first sea in China that meets the 'Double Ten' standard (the offshore distance is not less than 10 kilometers and the water depth of the sea is not less than 10 meters when the tidal flat width exceeds 10 kilometers). Wind power project. The Rudong project was officially started on May 8, 2015. A total of 38 wind turbines were installed with a total installed capacity of 152,000 kilowatts. On September 8, 2016, CGNPC announced that China's first “Double Ten†offshore wind power project's CGNPC Rudong Offshore Wind Power Project was put into commercial operation, marking that China has become a sea wind power after Germany, the United Kingdom and other countries. One of the countries that build core capabilities.
Behind the identification of eight scientific and technological achievements, CGNPC faced the environmental test and technological innovation in the construction of the first “Double Ten†offshore wind power project. Under the premise of ensuring safety and quality, CGNPC has carefully designed and planned the project, so that the Rudong project has achieved many innovations at home and abroad. Such as the successful completion of the first offshore booster station in Asia, the use of onshore modular construction, offshore hoisting construction program, greatly reducing the time of offshore construction operations; using micro-positive pressure closed, to solve the corrosion problem of the marine environment equipment, improved Equipment durability; proposed the overall solution for the design of the electrical system of the offshore booster station; using the integrated monitoring and management platform of the offshore wind farm to achieve unattended and remote operation and maintenance; using a single pile type without transition section, improve The reliability and economy of the foundation of the offshore booster station; the fire-proof structure of the steel and refractory combination, the fire-extinguishing system combined with the high-pressure water mist fire extinguishing system and the fire probe ensure the safety of the offshore booster station. All of the above aspects have set a precedent in the country.