Five face machining center processing, eliminate residual stress, rigidity, make the machine more stable, higher accuracy. Three axis full screw drive, using advanced breakpoint memory function, can continue to process in case of broken knife, power failure or the next day.
Model
CX-2-600-200
CX-4-300-200
Working area
Column engraving:2×600×2000
Column engraving:4×300×2000
Maximum work rate
15m/min
Working power supply
AC380v/±10%,50HZ
Cooling method
Water-cooling
Repeat Accuracy
DSP/NC studio
Transportation
0.02mm
Control system
Screw
Order Code
G code ,U00,mmg,plt
Spindle power
5.5×2
4.5×4
Whole power
3550×2450×2650
3550×2450×2650
Machine size
13KW
20KW
Net weight
3
3
Column Engraving Machine,Stone Engraving Cnc Machine,Stone Engraving Cnc Router,Stone Cnc Router JINAN HT MACHINERY CO.,LTD , https://www.jncncrouter.com
Liquid line magnetic ferrous traps designed to extract remove the ferrous materials from liquid and slurry lines in order to purify the material in the production process. Strong magnetic traps filter the flow and extract the unwanted ferrous metal. While the slurry and liquid flows around the magnetic tubes, a very strong magnetic field (generated by the neodymium NdFeB magnets inside of the tubes) traps all metallic particles on the surface of the tubes.
In the course of manual cleaning the inner part of the separator is taken out, the magnetic cores are pulled out of the tubes (by operating lever) and the captured magnetic impurities fall off the tubes spontaneously.
Â
Application for high performance liquid ferrous metal trap magnets :
 As advanced liquid trap magnets,These easy cleaning in pipeline metal trap magnets are an ideal magnetic traps for removing super fine ferrous contamination from materials of liquid,Semi-liquid lines or air-conveying lines experienced in most cases with no appreciable pressure drop or reduction in flow rates. All units incorporate a sump type housing to trap ferrous particles. Liquid Traps may be installed horizontally, vertically, or on an angle without affecting their magnetic efficiency.
Technical Parameters
NO.
Model
Diameter ofÂ
the drumÂ
(mm)diameter of
 the pipeline Â
  (mm)QuantityÂ
(piece)Weight
(kg)InterfaceÂ
mode
1
RCYJ150/40
159
45
5
19
F/C
2
RCYJ150/50
159
57
5
21
3
RCYJ150/65
159
76
5
23
4
RCYJ200/50
200
57
7
35
5
RCYJ200/80
200
89
7
38
6
RCYJ200/100
200
108
7
43
7
RCYJ250/100
250
108
9
43
8
RCYJ250/125
250
138
9
45
9
RCYJ250/150
250
159
9
48
10
RCYJ300/125
300
138
9
60
11
RCYJ300/150
300
159
9
64
12
RCYJ300/200
300
219
9
70
Note:The installation and the magnetic intensity can be customerized according to the users'specail requirements.
FAQ
A:Â Yes, we can help you combine a complete mineral processing line. and give you related professional advice as long as you need.
Q: Are you a factory ?Â
A:Yes,we are factory, which was established in 2006.
We focus on providing expert service including design, manufacture, installation & maintenance for the logistic industries & warehouse equipment.
Q:Â Terms of Payment:
A:30% of the total amount by TT as deposit, the balance to be paid by TT or L/C at sight before the machines leaving seller' factory.
100% irrevocable L/C at sight.
 Q:Time for preparation of goods:
A:The above machines shall be ready for delivery during 45 days from the date of receiving the deposit/LC, excluding the time of waiting for shipment. If there is any delay of delivery caused by seller, 3‰ of the total amount shall be paid to buyer each day, but this amount shall not exceed the amount of deposit; if the delay is caused by buyer, 3‰ of the total amount shall be paid to seller each day, but this amount shall not exceed 10% of total value of machines.      Â
 Q:Guarantee period:
   A:The guarantee period for the above machines is twelve months from the date of putting into use, but not exceeds twenty-four months after the machines leaving seller's factory. It is not applicable for quick wear parts.
Q: May I know the status of my order?
A: Yes. We will send you information and photos at different production stage of your order. Every step will be send to you in time.
Q: Can I customize shelving or racking at my own size?
  A: Sure.
Q: If i need the complete mineral processing line. is Baite able to help us build it?
There is a rich experience engineer team of us. we had already build many mining projects in China & Overseas. You can believe our quality and service.Â
Why Choose us?
1.Pre-sale services: enthusiasm
We provide you with the prophase plan, process flow design and manufacturer equipment according to your special demand.
2.one-year warranty to make sure your machine runs consistently.
We always offering lifelong services and provide spare parts for a long term,and repair main parts under right using for free in two years.
3.Technical services
3.1 Design of production line and solutions according to buyer's requirement.
3.2 In 7 days after the receipt of deposit, the seller shall provide related technical documents for equipment installation, in addition to those with special requirements.
3.3 Before delivery, the seller can modify the previous solutions according to buyer's requirement. Â Â
4.After-sales service
4.1 During the installation and commissioning, the seller shall send technician to the site for instruction of installation and commissioning, and for training of workers.
4.2 If there is any equipment failure caused by the buyer, the seller shall assist the maintenance of machines and replacement of fittings, and charges appropriate fees.
4.3Â Beyond the guarantee period, the seller can provide services and fittings at a most preferential price.Â
4.4The seller can provide consultation and inspection services freely for other products, especially for the up-stream and down-stream products of our equipment.Â
PACKAGE & Ship:
Work Shop View:
Â
Â
Introduction:
Liquid line magnetic ferrous traps designed to extract remove the ferrous materials from liquid and slurry lines in order to purify the material in the production process. Strong magnetic traps filter the flow and extract the unwanted ferrous metal. While the slurry and liquid flows around the magnetic tubes, a very strong magnetic field (generated by the neodymium NdFeB magnets inside of the tubes) traps all metallic particles on the surface of the tubes.
In the course of manual cleaning the inner part of the separator is taken out, the magnetic cores are pulled out of the tubes (by operating lever) and the captured magnetic impurities fall off the tubes spontaneously.
Â
Application for high performance liquid ferrous metal trap magnets :
 As advanced liquid trap magnets,These easy cleaning in pipeline metal trap magnets are an ideal magnetic traps for removing super fine ferrous contamination from materials of liquid,Semi-liquid lines or air-conveying lines experienced in most cases with no appreciable pressure drop or reduction in flow rates. All units incorporate a sump type housing to trap ferrous particles. Liquid Traps may be installed horizontally, vertically, or on an angle without affecting their magnetic efficiency.
Technical Parameters
NO.
Model
Diameter ofÂ
the drumÂ
(mm)diameter of
 the pipeline Â
  (mm)QuantityÂ
(piece)Weight
(kg)InterfaceÂ
mode
1
RCYJ150/40
159
45
5
19
F/C
2
RCYJ150/50
159
57
5
21
3
RCYJ150/65
159
76
5
23
4
RCYJ200/50
200
57
7
35
5
RCYJ200/80
200
89
7
38
6
RCYJ200/100
200
108
7
43
7
RCYJ250/100
250
108
9
43
8
RCYJ250/125
250
138
9
45
9
RCYJ250/150
250
159
9
48
10
RCYJ300/125
300
138
9
60
11
RCYJ300/150
300
159
9
64
12
RCYJ300/200
300
219
9
70
Note:The installation and the magnetic intensity can be customerized according to the users'specail requirements.
FAQ
A:Â Yes, we can help you combine a complete mineral processing line. and give you related professional advice as long as you need.
Q: Are you a factory ?Â
A:Yes,we are factory, which was established in 2006.
We focus on providing expert service including design, manufacture, installation & maintenance for the logistic industries & warehouse equipment.
Q:Â Terms of Payment:
A:30% of the total amount by TT as deposit, the balance to be paid by TT or L/C at sight before the machines leaving seller' factory.
100% irrevocable L/C at sight.
 Q:Time for preparation of goods:
A:The above machines shall be ready for delivery during 45 days from the date of receiving the deposit/LC, excluding the time of waiting for shipment. If there is any delay of delivery caused by seller, 3‰ of the total amount shall be paid to buyer each day, but this amount shall not exceed the amount of deposit; if the delay is caused by buyer, 3‰ of the total amount shall be paid to seller each day, but this amount shall not exceed 10% of total value of machines.      Â
 Q:Guarantee period:
   A:The guarantee period for the above machines is twelve months from the date of putting into use, but not exceeds twenty-four months after the machines leaving seller's factory. It is not applicable for quick wear parts.
Q: May I know the status of my order?
A: Yes. We will send you information and photos at different production stage of your order. Every step will be send to you in time.
Q: Can I customize shelving or racking at my own size?
  A: Sure.
Q: If i need the complete mineral processing line. is Baite able to help us build it?
There is a rich experience engineer team of us. we had already build many mining projects in China & Overseas. You can believe our quality and service.Â
Why Choose us?
1.Pre-sale services: enthusiasm
We provide you with the prophase plan, process flow design and manufacturer equipment according to your special demand.
2.one-year warranty to make sure your machine runs consistently.
We always offering lifelong services and provide spare parts for a long term,and repair main parts under right using for free in two years.
3.Technical services
3.1 Design of production line and solutions according to buyer's requirement.
3.2 In 7 days after the receipt of deposit, the seller shall provide related technical documents for equipment installation, in addition to those with special requirements.
3.3 Before delivery, the seller can modify the previous solutions according to buyer's requirement. Â Â
4.After-sales service
4.1 During the installation and commissioning, the seller shall send technician to the site for instruction of installation and commissioning, and for training of workers.
4.2 If there is any equipment failure caused by the buyer, the seller shall assist the maintenance of machines and replacement of fittings, and charges appropriate fees.
4.3Â Beyond the guarantee period, the seller can provide services and fittings at a most preferential price.Â
4.4The seller can provide consultation and inspection services freely for other products, especially for the up-stream and down-stream products of our equipment.Â
PACKAGE & Ship:
Work Shop View:
Â
Â
Rcyj Liquid Pipeline Permanent Iron Removing Machine/ Magnetic Separator for Cement Plant
Model NO.: RCYJ
Energy Saving: Energy Saving
Warranty: 1 Year
Color: Customized
Customized: Customized
Condition: New
Dimension: Customized
Capacity: 0.05~250 Tph
Cleaning Way: Manual Cleaning
After-Sales Service: Engineers Available Overseas
Cooling Way: Sel-Cooling
Adaptive Belt Speed: Max 4.5 M/S
Trademark: BAITE
Transport Package: Polywood and Steel Frame
Specification: stainless steel
Origin: China
HS Code: 84741000
Model NO.: RCYJ
Energy Saving: Energy Saving
Warranty: 1 Year
Color: Customized
Customized: Customized
Condition: New
Dimension: Customized
Capacity: 0.05~250 Tph
Cleaning Way: Manual Cleaning
After-Sales Service: Engineers Available Overseas
Cooling Way: Sel-Cooling
Adaptive Belt Speed: Max 4.5 M/S
Trademark: BAITE
Transport Package: Polywood and Steel Frame
Specification: stainless steel
Origin: China
HS Code: 84741000
Introduction: