Rare earth concentrate pellet de-ironing and dephosphorization

Rare earth concentrate pellet electric arc furnace, removal of iron ore furnace preparing a rare earth phosphate fine slag, smelting rare earth ferrosilicon alloy qualified important part. The following focuses on the process and principle of preparing rare earth concentrate slag by de-ironing and dephosphorization of electric arc furnace.

Rare earth concentrate pellet arc furnace de-ironing and dephosphorization process The use of electric arc furnace for rare earth concentrate de-ironing and dephosphorization to prepare rare earth concentrate slag has the advantages of simple process, convenient operation and high equipment utilization rate, so it is adopted in industrial production. The process flow is shown in Figure 1. The equipment used is an electric arc furnace for smelting rare earth ferrosilicon alloy, and the slag iron tank is a high temperature resistant iron casting. After the slag iron in the tank is statically cooled for more than 8 hours, it can be completely separated. Note that high-phosphorus iron cannot be mixed into the slag.

Strut Channel Fittings

Rubber cushions fit material tightly to reduce vibration and provide a more secure hold than loop hangers. The cushions also protect material from sharp edges and prevent corrosion caused by metal-to-metal contact. Hangers have a threaded nut on top for mounting with threaded rod.
Zinc-plated steel hangers have good corrosion resistance. 304 stainless steel hangers have excellent corrosion resistance.
Hangers with EPDM-SBR cushion have one cushion that completely surrounds material to compensate for material expansion and contraction. Hangers with Buna-N cushion have three cushions to tightly grip material.

Strut Channel Fittings,Hinge Fitting,Unistrut Fittings,Strut Fittings

SUZHOU METAL (BIM) TECHNOLOGY CO., LTD , https://www.szbimmetal.com