Armored Liquefied Natural Gas Control System Project Settled in Shuyang

Drying equipment

On August 14th, Hubei Taihe Electric Co., Ltd. signed a project cooperation agreement with Xiangyang Hi-tech Zone in Hubei Province. The central control system for armored liquefied natural gas (LNG) officially co-operated by Hubei Taihe Electric Company, CNOOC, and Sanjiang Space Group was officially established. Area.

The project will have a total investment of 1.2 billion yuan, and it will be able to produce an annual output of 800 sets of LNG-controlled LNG central control systems, achieving an output value of 1.76 billion yuan.

According to reports, fixed CNG refueling stations are highly dependent on natural gas sources and pipe networks, which is not conducive to the promotion of natural gas vehicles. The skid-mounted LNG/CNG refueling station has the characteristics of less land occupation, small investment, easy operation, short construction period, and easy relocation, which overcomes the dependence of natural gas on the gas source and the pipe network. The skid-mounted LNG/CNG refueling station and gas station are used together or parked in a parking lot to facilitate the refueling of CNG vehicles. The skid-mounted LNG/CNG refueling station can also supply gas to users, which not only solves the problem of gas users who are far away from the natural gas pipeline network, but also saves investment in laying gas pipeline networks.

Hub Bolt

Hub Bolt,Wheel Hub Bolt,Bolt On Hub,Hub Studs

wenzhou dayang fastener co.,LTD , https://www.dayangfastener.com